Homepage

Interceptor Rehabilitation Project

Protecting Infrastructure & Ensuring Reliable and Continuous Long Term Service: The 5.5-mile system, originally installed in 1977, has experienced corrosion of the concrete pipe and structures (manholes and metering stations). The most recent video inspection by Great Lakes TV Seal,... View Details >

Effluent Disc Filter Project

Meeting TMDL Discharge Limitations & Protecting the Environment: HOVMSD has determined that additional treatment will be necessary to achieve compliance with its phosphorus and suspended solids Total Maximum Daily Load (TMDL) allocations. The District conducted a pilot study that validated... View Details >